15 days more to donate 2000 euro left for the PCB

Thanks to the donations already received, the work on the  PCB design can move forward and we estimate it could be completed by the End of September 2020. The date of publication of the PCB design will heavily depend on the results of the internal review process once we receive the first draft, hopefully it will not take long. The design of the PCB is meant to fit inside the Slimbook Eclipse body.

Picture by skeeze from Pixabay

As we were unable to reach the goal by August, we are forced to postpone the deadline of the current Donation Campaign (Phase 1A) to the 15th of September 2020

We kindly ask all followers, friends, and donors to concentrate their donations before the 15th September 2020, to ensure the end of Phase 1A to avoid an additional delay.

The plan is to deliver the PCB design with the end of Phase 1A, and right after that start Phase 1B “Fast SI bus simulations” on the 16th of September with a goal of € 5000 (around $ 5600). As a consequence, there will be no interruption in the donation campaign, it will transparently fade from Phase 1A to Phase 1B seamlessly.

Subscribe to our Newsletter

Term & Conditions

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.